A series in four parts · Part two

Urban planning

Why the Megaproject Dies

Four Chicago megasites, fifty-five years, one structure, and the ordinary blocks next door that never stopped building.

Miles Sisk 7 min read4 figures
Slide two.
A hillside town built for one person, from the South Park episode
South Park, Paramount. Shown as commentary on the episode's premise.

The joke is that one man gets to plan a whole town for himself. Chicago's version of the joke is that we keep handing one developer sixty acres and calling it a neighborhood. It's time for our cities to stop planning Billionaire Weenie Town: sixty-acre parcels that only large capital can touch. Cities ought to be platting small, traditional lots that a local builder or a family can buy.

Jonathan Konkol perfectly encapsulates this point in his 2020 piece for Plan Design Xplore, Why Not Incrementalism?:

"This way of building is, however, an anomaly in the history of human habitation. While Popes and Caesars had the power to reshape districts, almost all building in cities has been incremental and small scale in nature. Until the rise of corporate investment banking, only the church and the crown had the power to build this way... Most of our cities were developed on a grid system made up of modules of 50x100 foot lots. It's far easier for a small local developer to purchase one or two of these and put up a modest building... When lots of parcels are consolidated, only the big national builders, fueled by institutional capital, can compete."

Chicago has been running Jonathan's experiment in reverse for fifty-five years, and I can show you the scoreboard.

Figure 1Four Chicago megasites, fifty-five years, one structure

Years each site sat vacant under a single consolidated plan, from the last building coming down to the first new one going up. Hover a dot for the plan that failed.

Timeline of four Chicago megasites from vacancy to first building, 1970 to 2026
Vacant, one plan on the tableStill vacantA consolidated plan approved, then failedFirst building
Table view and sources

Sources: City of Chicago (The 78 project page); Belt Magazine on Rezkoville; Chicago Lakeside Development and Block 37 histories (Wikipedia, with primary citations); The Real Deal, Sun-Times, WTTW and Chicago YIMBY reporting on Lincoln Yards and Foundry Park, 2025 to 2026; Quantum Insider on the South Works groundbreaking, Sep 30, 2025.

The 62 acres at Roosevelt and Clark have been vacant since Grand Central Station came down in 1971. South Works, 415 acres of lakefront, has sat empty since the mill closed in 1992. Block 37, in the middle of the Loop, sat cleared for twenty years. The Finkl steel site on the North Branch has been empty since 2012. Every one of them was assembled into a single parcel, entitled as a single planned development, tied to a single developer's financing, and handed its own public subsidy. And every time that one developer's balance sheet or thesis broke (a corruption case, a steel company walking away, a REIT collapse, an office market, a pandemic) the entire site stopped, because nobody else had standing to build on any part of it. The shocks were different every time. The structure was the constant.

Lincoln Yards is the one you can watch in real time. Sterling Bay bought the Finkl site in 2016 and won approval in April 2019 for a $6 billion, 14.5 million square foot plan with up to $1.3 billion in tax increment financing behind it. It completed exactly one building, a life sciences tower that sat empty. The lender took the northern half in 2025. The site is now split three ways by foreclosure sale, and on September 23 the City Council approved $201.6 million in public money for the roads, parks and bridge: roughly a fifth of the subsidy the original deal carried, seven years late.

14
years since Finkl came down
1
building completed, still empty
0
homes built of 6,000 approved
$1.3B
public support authorized in 2019
$201.6M
public money approved Sep 23, 2026, for the successor plan
The Lincoln Yards timelineShow the math
WhenWhat
1902 to 2012A. Finkl & Sons operates the steel mill on the North Branch; closes and is demolished in 2012.
2016Sterling Bay assembles the site, about 53 acres.
April 2019City Council approves the Lincoln Yards planned development: $6 billion, 14.5 million square feet, up to 6,000 homes, with the Cortland/Chicago River TIF district authorized for up to $1.3 billion in developer reimbursements.
2023One building completed, a life sciences tower at 1229 W. Concord. It opens without tenants.
2025The lender takes the northern parcel. The site is split three ways through foreclosure sale; the southern parcels go to separate buyers.
2026Foundry Park (JDL Development and Kayne Anderson), the successor plan for the northern parcel, is approved at 3,737 homes plus hotel, office and retail. Reported site size varies by outlet: 28 acres (Urbanize), 31 acres (WTTW). Phase 1 to finish 2031; full buildout 2036 (WTTW; Urbanize says 2034).
Sep 22 and 23, 2026Finance Committee advances, then full City Council approves, $201.6 million in TIF for Foundry Park: roads $71M, parks $69M, riverwalk $33.5M, 606 trail bridge over the river $21.5M, site preparation $7M. The original 2019 Lincoln Yards deal carried a $900 million TIF subsidy plus $400 million in tax credits.

Sources: WTTW, Sep 22, 2026; Urbanize Chicago, Sep 28, 2026; City of Chicago DPD release, Sep 2026; Chicago City Council records (2019 PD and TIF ordinances).

Meanwhile, next door, the ordinary blocks of Lincoln Park did what ordinary blocks do. Between 2016 and this month they permitted 94 new buildings on individual lots, roughly $90 million of private construction, with at least one new home permitted every single year, 2020 included. The 53 acres beside them permitted one building. Same pandemic, same interest rates, same city. The shocks that killed the megaproject never reached the neighborhood.

Figure 2New buildings permitted on single lots within half a mile of Lincoln Yards, 2016 to 2026

Each dot is one new-construction permit on an individual lot. Drag the year to watch them appear; hover a dot for the address.

2026
New building permit on a lotDashed: the 800 m query radius around the site center
All 94 new-building permits on individual lots, 2016 to Oct 2026, within 800 m of the site center; the site's own one building (1229 W. Concord) is excluded. Site outline still to be traced from the planned development boundary. Source: City of Chicago Data Portal, Building Permits (ydr8-5enu), pulled Oct 15, 2026.
The permit pull, and what it does and doesn't claimShow the math

Query: City of Chicago building permits dataset, all permits within 800 meters of the Lincoln Yards site center (41.9162, -87.6596), issued January 2016 through October 2026, permit type "new construction." Of 130 permits returned, 94 are new buildings on individual lots after removing tents, interior build-outs, garages, additions and the four permits for the site's own life-sciences building (1229 W. Concord, about $84 million). Reported construction cost of the 94: about $90 million. Permits by year: 12, 8, 11, 6, 9, 10, 7, 8, 10, 9, 4 (2016 through Oct 2026). Of the 84 with a stated unit count, 61 are single-family houses, 12 two-flats, 7 three-flats, 3 six-unit and 1 twelve-unit buildings.

What it does not claim: net housing added. The same radius and period shows about 120 wrecking permits for buildings, 38 of them for multi-unit buildings, and at least 16 of those were followed by a single-family permit at the same address. The claim in the post is continuity: small lots kept building through every shock that stopped the megaproject. The teardown pattern is the reason for Part three.

Source: City of Chicago Data Portal, Building Permits (dataset ydr8-5enu), pulled Oct 15, 2026. Classification by work description; the filter list is in the research doc.

This is the whole difference between one balance sheet and many. Plat the northern 31 acres of Lincoln Yards on Chicago's standard 25 by 125 foot lot and you get about 280 lots. At the surrounding blocks' mix that is roughly 500 homes; at three-flat density, more than 800; assemble the corners and the arterials for mid-rise, the way every pre-war Chicago neighborhood actually grew, and you are at two thousand or more. Foundry Park's approved plan is up to 3,737 units on the same land, and I am not going to pretend otherwise: a plat trades peak density for speed, resilience and local ownership. What it never does is sit empty. The plat starts producing homes in year one and never stops. The megaproject produced zero homes in fourteen years and is now scheduled to finish in 2036, twenty-four years after Finkl closed. We need the money to start rolling now, not in ten years.

Figure 3The same 31 acres, two ways

Left: one parcel, one owner, one plan. Right: the same land on Chicago's 25 by 125 foot lot, with 66-foot streets and 16-foot alleys, and the leftover strip as a park.

Today
Platted
Schematic. The method follows Jonathan Konkol's 2020 Lloyd Cinemas study; Chicago dimensions and counts are mine.
Figure 4What the same 31 acres hold

Homes on the platted site at three densities, beside the approved single-developer plan.

The plat trades peak density for year-one starts and many owners. Figures from the plat math panel.
The plat mathShow the math
StepFigure
Northern parcel, gross (reported as 28 to 34 acres; 31 used)31 acres, about 1,350,000 sf
Net to lots after streets and alleys (about 65 percent)about 878,000 sf
Standard Chicago lot, 25 × 1253,125 sf
Lotsabout 280
Homes at the surrounding blocks' mix (about 1.8 per lot)about 500
Homes at three-flat density (3 per lot)800 and up
Homes with corners and arterial frontages assembled for mid-rise2,000 and up
Foundry Park approved plan, same landup to 3,737

The method follows Jonathan Konkol's 2020 study of Portland's Lloyd Cinemas site, which platted a consolidated superblock back onto the 50 by 100 grid. The Chicago lot, the ratios and the counts are mine.

Chicago already knows how to do this, as long as the land is cheap. The Large Lots program sold vacant city lots to the neighbors for a dollar. The Missing Middle initiative sells clusters of city lots to small developers for a dollar apiece, with construction subsidy, for two-flats and three-flats; its September round drew 34 applications for 30 lots in West Englewood and South Chicago, and the program had already put more than 300 homes across 106 buildings in motion. So the city sells small lots to small builders on the South Side and hands 53 acres to one developer on the North Side. Why does that knowledge stop at the river?

This post is arguing that our government ought to work toward providing and favoring small developers with more land opportunities, and to recognize that granular platting is the more reliable path to the long-term development, and the eventual redevelopment, of our land.

One more thing the permits show, and it is the reason for the next post. On Lincoln Park's own blocks, incrementalism mostly meant two-flats torn down for single-family houses. Small lots solve the problem of who gets to build. They do not decide what gets built. That is a decision a neighborhood has to make on purpose, and right now nobody asks it to.

Credit: The method here follows Jonathan Konkol's 2020 study of Portland's Lloyd Cinemas site; the Chicago application and the numbers are mine.

Miles Sisk
Miles Sisk

Founder of Cascading Strategies, a Chicago political strategy and advocacy practice. Strategy, paid media, and research for campaigns, nonprofits, and coalitions, including bipartisan ones.

miles@cascadingstrategies.com

Read next

All essays